Capstone projects
Finish with a team project that brings everything together. Each capstone is delivered as the full sign-off package from Level 4, with the source in Git, regressions running in CI on Lumina, and every tool issue filed as a reproducible case.
- Duration
- 6 weeks, teams of 2–3
- Level
- Advanced
- Before you start
- The four core levels and at least one track.
- Integrate several blocks into a working subsystem
- Deliver a complete sign-off package as a team
- Run a project the way an IP team does: Git, CI and reproducible bug reports
6 projects
- 01
Secure storage controller
Topics
LM-AES-XTS, LM-DRBG and LM-TRNG behind an AXI4 interconnect, with a key management state machine
- 02
Authenticated streaming link
Topics
LM-AES-GCM with LM-LZS-E and LM-LZS-D: a compress-then-encrypt pipeline with a crossing between two clocks
- 03
Post-quantum key exchange
Topics
LM-PQC-K and LM-SHA3 with a RISC-V soft core running the protocol
- 04
Independent VIP
Topics
A UVM or cocotb VIP for one Lumina Block, built only from its datasheet
- 05
RTL-to-GDS study
Topics
One block taken through two predictive kits, comparing area, power, timing and wire delay
- 06
Agent-driven bug bash
MCP server · PlannedTopics
An AI agent and a human team race to close seeded bugs in a block through Lumina's MCP interface
Be the first to know when the courses open.
Write to us to hear when the first courses open, or to talk about a university course or training for your team.
Training
hello@lumeeslab.comHelpful to include
- Who you are, and whether you're learning yourself, teaching, or training a team
- The courses or tracks you're most interested in
- English or Turkish